My Time at Portia Equipment and Materials: From Research to Processing

Plan starter furnaces, grinders and cutters, then prepare for iron and steel processing. Work backward from equipment requirements, base quantities, fuel and processing times to find the missing step.

Edition: Normal play in the original My Time at Portia PC Steam base game, app 666140. Covers the introduction, early town-building requests and basic early-to-mid-game workshop equipment. Consoles, mobile, sequels, mods and the late-game Factory are outside scope.

Verification scope: Official product pages, announcements and public guides compared on 2026-10-04. No game launch, current build-number check or full Japanese UI comparison was performed. Numerical tables use unmodified base requirements.

Sources checked: 2026-10-04

48 / 48 rows

Searching does not open answer tables. Choose the answer you want to reveal.

Read tables as per-item, unmodified, in-game-time values

Worktable material reductions and relationship construction discounts are excluded. Times are base in-game processing times. Game-speed settings and machine types can change real-world waiting times or displayed values.

Wide tables scroll horizontally.

Read tables as per-item, unmodified, in-game-time values: 5 entries
CheckHow to read this pageCommon mistake
QuantityTables generally show the cost of 1 finished itemAssuming 5 raw bars alone will make the 5 plates needed
EquipmentRead the processing machine's name before the item namePutting Iron Ore in a Stone Furnace does not unlock iron recipes
ModifiersThe Worktable's Artisan reduction and construction discounts are separateA lower displayed cost than the base table is not necessarily wrong
FuelOperating fuel is required in addition to recipe materialsMistaking the 3 Wood used to make Charcoal for remaining furnace fuel
TimeUse in-game processing timeDo not read 50% game speed as twice-as-fast real-time production

The order for expanding from raw materials to machines is an editorial example. These tables do not guarantee a completion day, profit or optimal number of machines.

Assemble starter machines along the material chain

Wide tables scroll horizontally.

Assemble starter machines along the material chain: 5 entries
Item to makeResearch / diagram prerequisiteMaterialsProcessing equipment / actionMain use
Stone FurnaceStarting diagramStone Stool1+Wood10Make a Stone Stool from 10 Stone at the Worktable → Assembly Station Level 1Copper, bronze, bricks, glass and charcoal
GrinderStarting diagramOld Parts2+Copper Bar3+Grinding Stone2Copper from the furnace; Grinding Stones from 5 Stone each at the Worktable → AssemblyCopper blades and pipes; bronze pipes
Civil CutterStarting diagramCopper Blade2+Stone Brick5Blades from the Grinder, bricks from the furnace → AssemblyHardwood planks, bronze plates and marble planks
Basic SkiverStarting diagramMarble Plank1+Bronze Pipe2Plates from the Cutter, pipes from the Grinder → AssemblyCloth, leather and similar products
Wooden StorageLv1 WorktableWood20Craft at the Worktable and place in the workshopStore raw and processed materials separately

The 2 Grinding Stones for the Grinder require 10 Stone. Neoseeker's bridge page says 20, while its registration page and the Wiki say 10. This source disagreement is retained; if your display differs, use the in-game recipe.

Furnaces process ore, stone and sand into different products

Wide tables scroll horizontally.

Furnaces process ore, stone and sand into different products: 7 entries
One finished itemBase materialsEquipment used for the listed valuesBase timeNext use
Copper BarCopper Ore3Stone Furnace2 hours 30 minutesGrinder and machine bodies
Bronze BarCopper Ore4+Tin Ore1Stone Furnace3 hours 30 minutesBronze tools, plates and pipes
Stone BrickStone8Stone Furnace2 hours 30 minutesEquipment and construction components
GlassSand8Stone Furnace3 hours 30 minutesGlass components for assembly
CharcoalWood3Stone Furnace1 hourRaw material for later steel production; separate from Wood used as furnace fuel
Iron BarIron Ore3Civil Furnace2 hours 24 minutesEquipment upgrades and Worktable components
Carbon Steel BarIron Ore5+Charcoal1Civil Furnace3 hours 36 minutesHigher-tier cutter and steel plates

Higher-tier furnaces may take different times for the same materials. This comparison uses the machines listed. Collect the required output before moving to the next machine downstream.

Use the correct machines for pipes, blades, plates and cloth

Wide tables scroll horizontally.

Use the correct machines for pipes, blades, plates and cloth: 9 entries
One item to makeMaterialsProcessing equipmentBase timeSimilar names to distinguish
Copper BladeCopper Bar2Grinder1 hourNot Grinding Stone or Grinding Saw
Copper PipeCopper Bar2Grinder1 hourNot interchangeable with Bronze Pipe
Bronze PipeBronze Bar2Grinder1 hour 30 minutesNot a recipe using raw Copper Ore
Wooden BoardWood8Civil Cutter1 hour 30 minutesDifferent raw material and use from Hardwood Plank
Hardwood PlankHardwood5Civil Cutter2 hoursCannot be made from 5 Wood
Bronze PlateBronze Bar3Civil Cutter2 hoursBronze Pipes are made at the Grinder
Marble PlankMarble3Civil Cutter1 hour 30 minutesSome assemblies require Marble itself
Fiber ClothWorn Fur2+Plant Fiber2Basic Skiver1 hour 30 minutesDistinguish Fur from Worn Fur, and Cloth from Fiber Cloth
Steel PlateCarbon Steel Bar3Industrial Cutter2 hours 24 minutesCannot be made at the Civil Cutter

The Grinder, Cutter and Basic Skiver use Power Stones. They can stop for lack of fuel even with enough ingredients, so check remaining fuel together with the completion estimate.

Do not confuse regular research with mission diagrams

  1. After obtaining Data Discs, speak to Petra at the Research Center and check regular research options
  2. Request research using the disc amount for the desired machine's group. You may not be able to choose the order of diagrams within that group.
  3. While research is underway, check mail for progress. When the diagram arrives, compare the handbook and required equipment tiers.
  4. For story-mission diagrams, follow that mission's dialogue and disc quantity. Regular research can proceed separately.

Wide tables scroll horizontally.

Do not confuse regular research with mission diagrams: 3 entries
SituationWhat to checkNext action
You can give additional discsIs this research acceleration or a new research request?Read the option before handing them over
You received a different diagram from the one wantedIs it another diagram in the same disc-cost group?Check the received diagram and request the next regular research
A mission diagram has not arrivedDedicated dialogue, specified disc quantity and mail collectionDonating to regular research alone does not complete it

The Research Center table is marked as based on old Steam version 2.0.137299 and needing an update. It is not used as a schedule guaranteeing a particular machine on a particular day.

Answer 6 (spoilers)

Answer — reveal (spoilers)Close

Research and diagram examples for iron and steel machinery

Wide tables scroll horizontally.

Research and diagram examples for iron and steel machinery: 5 entries
Item to makeResearch / diagram prerequisiteMaterialsProcessing equipment / actionConfirmation
Civil FurnaceRegular 5-disc research groupStone Stool2+Bronze Plate5+Marble Plank3Make components with the existing Worktable and Civil Cutter → Assembly Station Level 1Iron Ore processing recipes become available
Grinding SawWorktable Lv2Blood Stone3+Iron Bar2+Resin2Make iron in a furnace, then use Worktable componentsPrepare 2 for the Industrial Cutter
Industrial CutterRegular 10-disc research groupGrinding Saw2+Carbon Steel Bar10+Simple Circuits4Steel from Civil Furnace, blade from Worktable Level 2 → Assembly Station Level 1Steel Plates can be processed
Steel PlateIndustrial Cutter completed3 Carbon Steel Bars per plateAdd Power Stone fuel and processCollect as materials for higher-tier machines
Industrial FurnaceRegular 10-disc research groupIndustrial Core2+Steel Plate5+Marble Plank5Steel plates from Industrial Cutter, cores from Worktable Level 2 → Assembly Station Level 1A higher-tier furnace is placed and operational

Individual tables list Civil Furnace research as 2 days and Industrial Cutter/Furnace as 4 days. However, baseline versions and acceleration differ, so no fixed delivery day is guaranteed here. Civil Furnace can supply steel even before you own an Industrial Furnace.

Choose Worktable and Assembly Station upgrades

  1. Select the equipment to upgrade in the A&G Construction catalog
  2. Distinguish Move from Upgrade and check materials and price
  3. If displayed values differ from the base table, check relationship discounts and other modifiers
  4. Recheck the upgraded equipment's level and target recipe

Wide tables scroll horizontally.

Choose Worktable and Assembly Station upgrades: 3 entries
Upgrade targetBase costMain changeCheck first
Worktable Lv1→Lv22,000 Gols+Wooden Board20+Old Parts5More advanced Worktable recipesThe part's required level; board processing and component stocks
Assembly Station Lv1→Lv25,000 Gols+Iron Bar20+Stone Brick20Supports larger assembliesThe handbook's station-level requirement and free yard space
Add another machineAssembly materials and placement space for that machineRun a different process in parallelCan you supply raw materials and fuel to both machines?

Upgrade Kits are for tools, not A&G workshop-equipment upgrades themselves. Listed base costs exclude material reductions.

Work back one step from a missing material

Wide tables scroll horizontally.

Work back one step from a missing material: 7 entries
Missing materialGathering / processing locationRequired tool / equipmentException
Copper/ Bronze BarCopper and tin from early ruins → furnacePickaxe, Stone Furnace and Wood fuelCopper alone cannot make bronze
Old PartsSearch for relics in early ruinsRelic Scanner and PickaxeNo guaranteed location or day for a specific part
Hardwood PlankHardwood from suitable trees → cuttingBronze Axe、Civil CutterDo not substitute Wooden Boards
Marble PlankMarble from surface rocks → cuttingSuitable Pickaxe and Civil CutterPrepare a Bronze Pickaxe for larger dark rocks
Bronze Pipe / Bronze PlateSmelt Bronze Bars firstPipes at the Grinder, plates at the Civil CutterThe same bar material goes into different machines
Carbon Steel BarPrepare Iron Ore and CharcoalCivil Furnace or higherCharcoal is a recipe material; Wood is furnace fuel
You have the diagram but cannot make the advanced machineCheck the level requirements of every componentWorktable upgrade, furnace and cutterLearning a diagram does not also complete its prerequisite machines

Calculate quantities and processing time before queuing

The following is practice in making estimates. These are original hypothetical examples using published recipes, not a record of actually accepting these jobs.

Wide tables scroll horizontally.

Calculate quantities and processing time before queuing: 4 entries
Hypothetical orderMaterial calculationTime for this process onlyExcluded
Make 4 Copper Pipes with 1 GrinderCopper Bar2×4=81 hour × 4 = 4 hoursBar-smelting time, fuel and travel
Make 5 Bronze Plates with 1 Civil CutterBronze Bar3×5=152 hours × 5 = 10 hoursPrior smelting of 15 Bronze Bars
Make those 15 Bronze Bars with 1 Stone FurnaceCopper Ore60+Tin Ore153 hours 30 minutes × 15 = 52 hours 30 minutesFuel shortages, waiting to collect output and other recipes
Split the same process between 2 machinesAllocate 8 to one and 7 to the otherLonger queue: 3 hours 30 minutes × 8 = 28 hoursConstruction materials, placement, fuel and the next process for both machines

A Stone Furnace queues up to 10 items at a time and holds 20 Wood of fuel, enough for 20 hours. The 15-item example totals processing time assuming further queueing and mid-process refueling of each furnace; it is not a prediction of unattended completion. The final row assumes two identical furnaces can run simultaneously. Without sufficient materials and fuel, there is no time saving. Judge whether to accept a commission by downstream processing and delivery as well as a single step's duration.

Frequently asked questions

I upgraded the Worktable but cannot make a large assembly

The Worktable and Assembly Station upgrade separately. Check both the handbook's required Assembly Station level and the Worktable level needed for the components.

Can I make bronze pipes and plates in the same machine?

With the standard early machines, pipes use the Grinder and plates use the Civil Cutter. Both require Bronze Bars first.

Should I research a better furnace first to save time?

Obtaining the diagram first may still leave you without equipment to make its assembly materials. Check the processing chain and fix the step currently blocking you.

I added the Wood for Charcoal, but the furnace stops

Wood consumed as an ingredient is separate from Wood consumed to run the furnace. Check and refill the fuel supply as well as the recipe quantity.

🔥Popular guides
  1. 1Brotato Character Tier Comparison: First Clear and Danger 5 Picks
  2. 2Dungeon Clawler Builds: 4 Early Choices and 6 Character Builds
  3. 3Brotato Build Guide: Weapons, Upgrades and Pitfalls for 8 Characters
  4. 4Everything is Crab Walkthrough — Early Decisions to Higher Pressure
  5. 5Mouthwashing Walkthrough and Collectibles Guide

Based on site-wide views, captured July 6, 2026 (previous 28 days plus capture day).